Suspended chandeliers, festive features, sculptures, banners and structures rigged from mall, hotel and venue ceilings in Dubai, Abu Dhabi, Sharjah and across the UAE.

Redfox rigs suspended installations from ceilings and atriums in malls, hotels and venues across the UAE.
Chandeliers, festive features, lit sculptures, banners, screens and structures: we plan the points, the loads and the lift, then install the piece safely above a live floor. A recent example is the structure of about 1,500 kg we rigged above the central atrium of The Galleria Mall, Abu Dhabi in two days.
We do the jobs others called not possible, and we plan them so they are routine on the night.
Every suspended install follows the same sequence.
Ceiling, points, access routes, floor loading and trading hours are checked on site.
Weights, point loads, hoists, access equipment and the lift sequence are set before the install night.
The area is secured, the piece is lifted, trimmed and fixed, with secondary safety on every point.
Lighting and power are tested, the area is cleared and the piece is handed over to the venue.
A few of the installations that show how Redfox works at height and under pressure.
Redfox installed the biggest chandelier in The Dubai Mall, planned and rigged for a live, high-footfall retail environment.
A suspended structure of about 1,500 kg rigged above the central atrium of The Galleria Mall, Abu Dhabi, in two days, working from a 42 m spider lift.
The illuminated ribbon across the exterior of The Galleria Mall, fixed to a live facade, rigged at height and powered with clean cable runs.
Redfox Contracting rigs suspended installations from mall, hotel and venue ceilings in Dubai and across the UAE. Recent work includes a structure of about 1,500 kg rigged above the central atrium of The Galleria Mall, Abu Dhabi, in two days.
Loads and rigging points are confirmed before anything is lifted, with the venue’s structural information and the weight and layout of the piece. Where the ceiling cannot take the load, we use truss and ground support instead.
Most atrium work is planned outside trading hours, overnight or early morning, with the area secured below. The programme is agreed with the mall operations and security teams.
Motorised chain hoists, drop steels, slings, shackles, truss and access equipment such as spider lifts and scissor lifts, chosen for the height, the load and the floor below.
Yes. Redfox installs, lights and powers the suspended piece, maintains it through the season and dismantles and stores it afterwards.
Send the weight, size and venue. We will come back with how we would rig it.