Electrical and technical installation for lighting, festive and decorative installations across Dubai and the UAE: power distribution, cabling, control systems, protection, and testing and commissioning before handover.

Lighting and decorative installations are often outdoors or in busy public spaces, and many run for weeks at a time or permanently. The electrical infrastructure behind them has to be weatherproof, protected and safe to be around.
At Redfox, electrical infrastructure is a planned stage of every project rather than an afterthought. Power requirements are worked out during technical planning, installed before the visible elements go up, and tested and commissioned before handover.
Electrical testing is one of the standing HSE controls on every Redfox project.
Systems inspected and tested as part of commissioning.
Issues closed out before the installation is handed over.
Troubleshooting and inspection continue through the installation’s run.
Yes. Electrical infrastructure is one of the nine stages of every Redfox project, covering power distribution, cabling and control systems, followed by testing and commissioning before handover.
Yes. Testing and commissioning is a dedicated stage of every project, and electrical testing is one of the standing HSE controls.